A look back at the special underground works file from Solscope in which our Deputy Technical Director and Scientific Advisor Umur Salih OKYAY was interviewed about the challenges of carrying out microtunneling projects.
Two projects currently underway are presented.
Common issue: river crossings.
These projects are taking place in specific geological and hydrogeological contexts and require an
analysis of the issues involved in order to achieve the objectives efficiently and safely.